PULL-A-PART CAR FACILITY
Client:
Pull-A-Part
Budget:
$1,924,897.00
Location:
Harvey, LA
Type of Work:
Site Prep, Utilities
Scope of Work
:
This is the second occasion that Pull-A-Part has hired Durr Heavy Construction as its site work and utility contractor to construct their state of the art car and auto part salvage center. Pull-A-Part is a national company, based out of Atlanta, which constructs and operates these technologically savvy auto salvage centers. Durr takes the project from the ground up, starting with a piece of land that is heavily wooded and bringing it to fully functional site ready to accept Pull-A-Part’s vehicles and customers.
Specific work items performed:
- Cleared and grubbed a 20 acre site to prepare for sand and stone installation.
- Demolished approximately 7,000 cubic yards of concrete slab onsite.
- Installed 77,000 cubic yards of pumped river sand
- Installed 97,000 square yards of geotextile fabric
- 38,500 tons of crushed stone was installed, compacted and fine graded to drain as the new yard for the new Pull-A-Part Facility.
- New water and sewer service utilities were installed including a new state of the art treatment plant.